Pacific Steel: Industrial Savings with a 1-Year Payback

Pacific Steel- Industrial Savings with a 1-Year Payback
Share this post:

A professional engineering analysis at Pacific Steel compared energy bills before and after the power conditioners were installed. The result? Annual savings of $3,140, almost exactly the cost of the product, meaning it paid for itself in just over a year. The site also saw a 22% reduction in demand charges, proving the ability to cut costs for large industrial customers.

Read other posts

Sequoyah Elementary School

Larry Anderson, President of Air Reliant Services LLC, has decades of experience in HVAC, facilities, and energy management. Naturally skeptical, he thoroughly...

May 19, 2025

Sinclair Gas Station

An audit at Hi Noon Gas Stations (Sinclair Petroleum) in Missoula measured amp draw before and after the Global Energy Saver installation....

May 19, 2025